<HTML><BODY STYLE="font:10pt verdana; border:none;"><DIV>Interesting as this post might be, its value is somewhat obscured by the total absence of any person to whom it might be connected--other than the articulate, courteous,&nbsp;and&nbsp;well-informed Mr. Roderick, who&nbsp;perhaps&nbsp;unites&nbsp;his saloonkeeping&nbsp;and public affairs analysis with a&nbsp;third career in school architecture and construction unbeknownst to me&nbsp; </DIV> <DIV>&nbsp;</DIV> <DIV>But that's the high quality of reportage which has characterized&nbsp;Mr. Roderick's recent contributions to our discussions.&nbsp; All over town, levy supporters are saying of him, and of his boon companions Donovan Arnold and Dale Courtney, with enemies like these, who needs friends?</DIV> <DIV>&nbsp;</DIV> <DIV>Melynda Huskey</DIV> <DIV>&nbsp;</DIV> <DIV>Note to Daily News:&nbsp; Don't stop the presses just yet.&nbsp;</DIV> <DIV>&nbsp;&nbsp;</DIV> <DIV>&nbsp;</DIV> <BLOCKQUOTE style="PADDING-RIGHT: 0px; PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #000000 2px solid; MARGIN-RIGHT: 0px"> <DIV style="FONT: 10pt Arial">----- Original Message -----</DIV> <DIV style="BACKGROUND: #e4e4e4; FONT: 10pt Arial; COLOR: black"><B>From:</B> cjs</DIV> <DIV style="FONT: 10pt Arial"><B>Sent:</B> Friday, April 15, 2005 10:46 PM</DIV> <DIV style="FONT: 10pt Arial"><B>To:</B> vision2020@moscow.com</DIV> <DIV style="FONT: 10pt Arial"><B>Cc:</B> smcclure@dnews.com</DIV> <DIV style="FONT: 10pt Arial"><B>Subject:</B> [Vision2020] THE TIDE IS RISING</DIV> <DIV>&nbsp;</DIV>&gt;I've been involved in a variety of construction projects<BR>&gt; both in this area and elsewhere as an ICC certified special inspector.<BR>&gt; School construction typically is different than other commercial &gt; development<BR>&gt; and the expenses frequently are higher.&nbsp; For example, schools are used &gt; as<BR>&gt; emergency shelters and are usually designated as "essential" bringing<BR>&gt; additional code-related costs in construction.<BR><BR><BR>&gt; The numbers look surprisingly low.&nbsp; I noticed that Hummel used a figure &gt; of<BR>&gt; about $87 per square foot for construction costs.&nbsp; I think that this is<BR>&gt; unrealistic, especially in light of the soaring material costs that have<BR>&gt; plagued the construction industry (steel has doubled in the last two &gt; years<BR>&gt; and concrete suppliers faced shortages of cement last year driving a &gt; price<BR>&gt; increase.)&nbsp; A more reasonable number would be somewhere in the &gt; neighborhood<BR>&gt; of $100-$110 per square foot.&nbsp; Construction cost of the gym is &gt; significantly<BR>&gt; lower than that of the Hamilton Indoor Recreation Center.&nbsp; Without plans &gt; and<BR>&gt; specifications, essentially were buying a pig in a poke.&nbsp; Schools are<BR>&gt; typically of a masonry construction, which can be very expensive.&nbsp; I &gt; think<BR>&gt; that Hamilton Rec was a wood-framed building utilizing structural steel<BR>&gt; connections.&nbsp; (Been a while since I looked at those plans.)<BR><BR><BR>&gt; On site development, an average cost is approximately $10-&amp;13.&nbsp; Hummel &gt; has<BR>&gt; these estimated at $8.70 per square foot. These numbers can change very<BR>&gt; dramatically depending on soil conditions and weather.&nbsp; The native loess<BR>&gt; that we have in this region can become unworkable quickly if it is wet.<BR>&gt; Since construction is proposed in a wetlands area, I wouldnt be &gt; surprised<BR>&gt; if a significant amount of removal and replacement with a more suitable<BR>&gt; construction material is necessary, which can be an expensive &gt; proposition.<BR><BR><BR>&gt; I suspect the inspection costs are also under-reported though without &gt; plans<BR>&gt; and specifications I can't be positive.&nbsp; Even in an area like Moscow, &gt; where<BR>&gt; we rely on uncertified individuals for special inspection, these costs<BR>&gt; typically run about .5% of the cost of construction and the .15% quoted<BR>&gt; seems very small.&nbsp; <BR><BR><BR>&gt; I think the contingency fund is completely inadequate.&nbsp; With a &gt; multi-year<BR>&gt; project, the potential for costly delays and material cost increases is<BR>&gt; pretty high.&nbsp; I would be much more comfortable with a 10% reserve.<BR><BR><BR>&gt; Either the Geotech fee is too high or the site surveying is under-bid.&nbsp; &gt; That<BR>&gt; those costs are almost even (with the Geotech more expensive) is a &gt; little<BR>&gt; surprising.<BR><BR><BR>&gt; Interestingly, the Lapwai High/Middle School project has gone out to &gt; re-bid<BR>&gt; because the proposals were significantly divergent from the cost &gt; estimates<BR>&gt; developed by Beniton Construction.&nbsp; I could see this happening to the &gt; new HS<BR>&gt; and either a reduction of the proposed school or a secondary levy which<BR>&gt; would include the facilities not yet in the proposal (i.e. the &gt; auditorium.)<BR><BR><BR>_____________________________________________________<BR>List services made available by First Step Internet, <BR>serving the communities of the Palouse since 1994.&nbsp;&nbsp; <BR>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; http://www.fsr.net&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <BR>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; mailto:Vision2020@moscow.com<BR>/////////////////////////////////////////////////////<BR></BLOCKQUOTE></BODY></HTML><br clear=all><hr>Get more from the Web.  FREE MSN Explorer download : <a href='http://explorer.msn.com'>http://explorer.msn.com</a><br></p>