[Vision2020] Getting Laid by the University of Idaho
Kit Craine
kcraine at moscow.com
Wed Mar 30 09:32:01 PST 2005
What’s worse is that (according to the Daily News) the new financial VP
will be paid $20,000 per MONTH. That’s $240,000 per year to the person
who decides other employees—many of whom do not make $20,000 per
year—will be fired.
Kit Craine
On Mar 29, 2005, at 4:36 PM, DonaldH675 at aol.com wrote:
>
> Visionaries,
>
> This is a difficult day for many people at the University of
> Idaho. Many loyal employees who have endured years without pay
> raises, decreasing medical benefits. and increased work loads are
> receiving pink slips. I am outraged that these people are being made
> to pay the price for the greedy senior administrative architects of an
> self-aggrandizing scheme to expand the University's power base. The
> villains in this piece remain free and apparently will not be held
> accountable for their crimes - a literally nauseating example of the
> Old Boys Network protecting its own. But that's not the worst of
> it. In last night's Daily News in the public news section I noted the
> following request for bid: (edited for brevity)
>
> ADVERTISEMENT FOR BIDS Page 2 of 2
> A4B_ArtifTurfProj
> DESCRIPTION OF WORK: This project consists of site preparation for the
> installation of approximately 104,500 S.F. of Tufted Infill Synthetic
> Turf. Two Filled Artificial Turf Multi-Use Fields are scheduled for
> construction at the University of Idaho during the spring and summer
> of 2005, with completion of infill synthetic turf installation by July
> 30, 2005 (under separate contract). The successful bidder will be
> responsible for coordination of installation of the turf as well as
> construction of the field base, sub-drainage system, turf edging,
> anchoring and other construction details as required by the turf
> manufacturer. Periodic inspection and acceptance of work by the turf
> vendor is required during preparation for the turf system
> installation as deemed necessary by the turf manufacturer.
> Generally, the earthwork for the fields will include stripping and
> exporting the top 4” of sod and topsoil from the field area and
> additional excavation of approximately 6” of existing sub-grade. The
> prepared base will
> consist of compacted sub-grade, sub drain system, a geotextile fabric,
> 4” of compacted ¾ minus rock with 2” of compacted ¼” minus rock
> leveling course for preparation of the infill product to be provided
> and installed
> by others. Electrical work includes field lighting, consisting of
> eight (8) galvanized 50-foot round tapered steel poles with flood
> lighting and associated electrical control. Other ancillary
> improvements to the fields include a 14’ x 24’ concrete block storage
> building, chain link and
> wrought iron style fencing, brick gate pilasters w/precast caps and
> wrought iron style gates, concrete flat work, concrete pavers, new
> goal posts, concrete steps and handrails, landscaping and irrigation.
> ESTIMATED COST: $640,000.00.
> Signed by:
> Jay Kenton, Vice President Finance and Administration
> UNIVERSITY OF IDAHO"
>
> What kind of priorities have been established at the University of
> Idaho that endorse saving money by laying off employees and cutting
> academic programs while concurrently spending $640,000 on two outdoor
> practice fields with wrought iron fencing and gates. Something is
> sadly awry at UI - where turf gets laid and employees get screwed.
> Rose Huskey
>
>
>
> "One cannot level one's moral lance at every evil in the universe.
> There are just too many of them. But you can do something, and the
> difference between doing something and doing nothing is everything."
> Daniel Berrigan
>
> _____________________________________________________
> List services made available by First Step Internet,
> serving the communities of the Palouse since 1994.
> http://www.fsr.net
> mailto:Vision2020 at moscow.com
> ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: text/enriched
Size: 5032 bytes
Desc: not available
Url : http://mailman.fsr.com/pipermail/vision2020/attachments/20050330/39ae48c9/attachment.bin
More information about the Vision2020
mailing list